Enerzone Solution 3.4 Especificações Página 44

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 52
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 43
44
Solution 3.4 Installation and Operation Manual
Appendix 4: Installation of Secondary Air Tubes and Baffle
1- Remove the 4 bricks on the left hand
side of the combustion chamber.
2- Starting with the rear tube, lean and
insert the right end of the secondary air
tube into the rear right channel h
ole.
Then lift and insert the left end of the
tube into the rear left channel.
3- Align the notch in the left end of the tube
with the left air channel hole. Secure
the tube in the channel hole using a
cotter pin.
4- Repeat step 1 and 2 for the other
secondary air tubes.
5- To remove the tubes use the above
steps in reverse order.
Vista de página 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Comentários a estes Manuais

Sem comentários